Key Business
- | Design, prototype building, testing of CS-VLA, CS-22, and CS-23 aircraft as a design subcontractor for external aircraft production facilities. | |||
- | Design, testing, certification & installation of EASA Minor/Major Changes (STCs) on | |||
- | CS-VLA Light aircraft | |||
- | CS-22 Sailplanes | |||
- | CS-23 Small aircraft | |||
- | CS-27 Small rotorcraft | |||
- | CS-29 Large rotorcraft | |||
- | Specialities: | |||
- | Mission equipment installation (Cameras, Radars, Datalinks, ...) | |||
- | Avionics configuration changes | |||
- | Engine configuration changes | |||
- | Green field serial production setup & certification support |
Key Capabilities
- | Large team to design and produce a CS-23 prototype aircraft (including mold set and testing) within 18 months, from first line to first flight | |
- | Aviation design: | |
- | Structure | |
- | Electric/Avionics | |
- | Systems | |
- | Mechanics | |
- | Prototype building: | |
- | Composite production shop (molds and components) | |
- | Mechanics production shop | |
- | Final assembly shop | |
- | Testing | |
- | Full scale structural test bed | |
- | System test facility | |
- | CAT 3&4 flight test pilots part of the team; CAT 1&2 on contractor basis |